Volta Today

Your Voice from the Volta Region

Monday, 6 July 2026  |  Volta Region, Ghana

Ho West MP Hon. Emmanuel Kwasi Bedzrah Announces Major Progress on Dzolokpuita-Akome Bridge Repair

2 min read
Hon Emmanuel Kwasi Bedzrah

Honourable Emmanuel Kwasi Bedzrah, Member of Parliament for the Ho West Constituency, has shared an encouraging update on the long-awaited reconstruction of the collapsed Dzolokpuita-Akome bridge. In a recent video posted on his Facebook page, the MP visited the site to inspect ongoing works, assuring residents and commuters that efforts to permanently fix the critical infrastructure are well underway. This development comes after months of hardship for communities relying on the route, following the bridge's collapse which severely disrupted transportation and economic activities in the area.

The Dzolokpuita-Akome bridge serves as a vital link for residents and traders travelling between communities such as Kpedze, Akome, Holuta (Honuta), Kpoeta, and surrounding areas in the Volta Region. Its collapse had caused significant inconvenience, forcing lengthy detours and affecting daily livelihoods, education, and commerce. Accompanied by the Ho West District Chief Executive and district engineers during the site visit, Hon. Bedzrah expressed empathy for the challenges faced by locals and appealed for continued patience as the contractor mobilizes resources on site.

Construction materials have already started arriving at the location, with plans for a new steel bridge to replace the damaged structure. The contractor has committed to completing the permanent repair works within two months (approximately eight weeks), a timeline that the MP and local authorities are committed to monitoring closely to ensure quality and timely delivery. This proactive intervention reflects the MP’s dedication under the #FocusOnHoWest initiative to address pressing infrastructural needs in the constituency.

Residents have welcomed the update with renewed hope, anticipating restored safe passage and a boost to local economic activities once the bridge is operational. Hon. Bedzrah’s hands-on approach and transparent communication via social media underscore his commitment to delivering tangible results for the people of Ho West. As works progress, commuters are advised to exercise caution around the site while the reconstruction advances toward completion. This project marks a significant step forward in improving connectivity and resilience in the region.

K
KEN STAFF Staff Writer

Ken is an experienced writer with over 3years of experience

Comments

No comments yet. Be the first to share your thoughts!

Leave a Comment
0/1000